1、市政基础设施工程深深层层搅搅拌拌桩桩施施工工记记录录市政施15共 页,第 页工程名称珠海科技创新海岸(北围)A区、B区市政道路工程十一标段承包单位深圳市中邦(集团)建设总承包有限公司单位工程名称珠海科技创新海岸(北围)A区市政道路工程二期工程-金峰北路分包单位/里程(区号)设计桩底标高(m)设计桩顶标高(m)设计桩长(m)设计水灰比设计水泥掺入量(kg/m)机具型号机号K0+045.543K0+056.383-7.602.009.600.450.5560SP-51#设计(试桩成果)参数钻进速度(cm/min)提升速度(cm/min)喷浆搅拌速度(cm/min)喷气压力(MPa)浆喷入量(kg/
2、min)808080/48.0桩 号地面标高(m)钻孔长度(m)桩底标高(m)喷浆长度(m)桩顶标高(m)工作时间累计喷浆量(kg)累计水泥用量(kg)实际水泥掺量(kg/m)实际水灰比桩位偏差(cm)备注钻孔用时(min)喷浆搅拌用时(min)重复搅拌用时(min)合计(min)1-14.0011.79-7.7911.792.400292920491000.1662.465.00.5131-24.0011.71-7.7111.712.35028282149908.2613.761.00.4841-34.0011.72-7.7211.722.38029291948911.8616.161.00
3、.4821-44.0011.80-7.8011.802.31028282149965.3626.862.00.5451-54.0011.79-7.7911.792.39027271946990.3651.564.00.5231-64.0011.80-7.8011.802.38029292150966.1661.765.00.4631-74.0011.73-7.7311.732.36029292048926.3605.460.00.5351-84.0011.75-7.7511.752.40027272048962.8629.362.00.5341-94.0011.77-7.7711.772.49
4、028282048954.2615.660.00.5501-104.0011.74-7.7411.742.47028282048940.4622.861.00.5141-114.0011.74-7.7411.742.42028281947979.3640.163.00.5311-124.0011.77-7.7711.772.30029292049958.0634.463.00.5111-134.0011.76-7.7611.762.360272719461019.6657.865.00.5531-144.0011.75-7.7511.752.400282820471022.6659.865.0
5、0.5521-154.0011.72-7.7211.722.33027272047965.8623.162.00.551项目技术负责人:质检员:施工员:监理工程师:年 月 日1-164.0011.79-7.7911.792.35028282048932.7638.863.00.4611-174.0011.80-7.8011.802.40028282048972.7652.864.00.4941-184.0011.76-7.7611.762.450292920491028.7663.765.00.5501-194.0011.77-7.7711.772.35028281947960.0627.46
6、2.00.5332-194.0011.70-7.7011.702.37029292150882.1604.260.00.4602-184.0011.77-7.7711.772.32027272048942.8645.864.00.4612-174.0011.75-7.7511.752.36029292049916.0606.660.00.5122-164.0011.75-7.7511.752.40028282049913.5609.060.00.552-154.0011.80-7.8011.802.49028281947950.6638.062.00.4922-144.0011.75-7.7511.752.300282819471006.0653.365.00.5412-134.0011.80-7.8011.802.35028282048959.7619.261.00.5522-124.0011.74-7.7411.742.31029292048910.5603.060.00.5122-114.0011.75-7.7511.752.47029292149937.8633.662.00.